Affiliation:
1. State Grid Inner Mongolia Eastern Power Co., Ltd. Inner Mongolia China
2. Tongliao Power Supply Company of Inner Mongolia East Power Co., Ltd. Inner Mongolia China
3. State Grid Inner Mongolia Eastern Power Co., LTD Kezuo Rear Banner Power Supply Company Inner Mongolia China
Abstract
AbstractLarge‐scale deployment of 5G base stations has brought severe challenges to the economic operation of the distribution network, furthermore, as a new type of adjustable load, its operational flexibility has provided a potential way to promote the consumption and utilization of photovoltaic. In this paper, a multi‐objective interval collaborative planning method for virtual power plants and distribution networks is proposed. First, on the basis of in‐depth analysis of the operating characteristics and communication load transmission characteristics of the base station, a 5G base station of virtual power plants participating in the cellular respiratory demand response model is constructed. In view of the inherent contradiction between system economy and environmental performance, a multi‐objective interval optimization model for collaborative planning of virtual power plants and distribution networks is established with the lowest system investment and operating costs and the lowest carbon emissions as the optimization goals. The established model is transformed into a deterministic optimization problem, which is solved by NSGA‐II algorithm. The modified IEEE‐33 node system is used in the case analysis to analyse the impact of different planning schemes and response characteristics on the system economy. The calculation results verify the effectiveness of the proposed method.
Funder
Science and Technology Project of State Grid
Publisher
Institution of Engineering and Technology (IET)
Reference25 articles.
1. Energy consumption optimization of 5G base stations considering variable threshold sleep mechanism
2. 5G communication for the ubiquitous internet of things in electricity:technical principles and typical applications;Zhang N.;Proc. CSEE,2019
3. Key technologies and prospects of energy consumption management for 5G network in background of energy internet;Liu Y.B.;Autom. Electr. Power Syst.,2021
4. Optimizing the ultra-dense 5G base stations in urban outdoor areas: Coupling GIS and heuristic optimization
5. An economic evaluation method for 5G transformation of distribution network based on particle swarm optimization and K‐means clustering;Guo L.;Power Syst. and Clean Energy,2022