Affiliation:
1. School of Automation Wuhan University of Technology Wuhan China
2. State Grid Jingmen Power Supply Company State Grid Hubei Electric Power Co., Ltd. Jingmen China
3. Guangdong Key Laboratory of Electric Power Equipment Reliability Electric Power Research Institute of Guangdong Power Grid Co., Ltd. Guangzhou China
Abstract
AbstractIn recent years, extreme weather events, such as typhoons, have led to large‐scale power outages in distribution systems. As a result, developing strategies to bolster distribution system resilience has become imperative. This paper proposes a two‐stage stochastic programming model aimed at enhancing this resilience. Prior to a typhoon, the first stage establishes a comprehensive wind field model based on extreme value distribution for accurate wind speed predictions. Simultaneously, a refined stress–strength interference model is used to determine the likelihood of distribution line failures. Taking into account the uncertainty of line damage, repair crews and mobile emergency generators are then strategically positioned at staging depots. Following the typhoon, the second stage coordinates network reconfiguration, dispatches repair crews, and mobilizes mobile emergency generators to minimize load shedding and expedite repairs. This model was validated on the IEEE 33‐bus distribution system, coupled with a corresponding transportation network, utilizing data from the 2018 super typhoon Mangkhut'' in China. Simulations indicate that our approach can effectively reduce load shedding and power outage durations, thereby enhancing the resilience of distribution systems.
Funder
National Natural Science Foundation of China
Publisher
Institution of Engineering and Technology (IET)
Reference49 articles.
1. Review of restoration technology for renewable‐dominated electric power systems
2. Resilience enhancement of distribution network under typhoon disaster based on two‐stage stochastic programming;Hou H.;Appl. Energy,2023
3. Electric Power Research Institute of Guangdong Power Grid Co. Ltd.:Meteorological analysis report of typhoon “Mangkhut”(2018)
4. Electric Power Research Institute of Guangdong Power Grid Co. Ltd.:Technical analysis of the causes of damage to power distribution equipment and summary report of the response to typhoon “Chaba”(2022)
5. Two‐stage optimization method of distribution network resilience enhancement under typhoon meteorological disasters;Chen X.;Guangdong Electr. Power,2022
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Fault Analysis of Guangdong Power Grid in China During 2023 Super Typhoon Saola;2024 9th Asia Conference on Power and Electrical Engineering (ACPEE);2024-04-11