Affiliation:
1. Research Group GRALTA of the School of Electrical and Electronic Engineering Universidad del Valle Ciudad Universitaria – Meléndez Cali Colombia
2. Instituto de Energía Eléctrica Universidad Nacional de San Juan ‐ CONICET, San Juan, J5400ARL Argentina
Abstract
AbstractThis article presents an optimization methodology to schedule the replacement of power transformers (PT) into a fleet. The objective is the minimization of the summation of the risk indices of the PT. Each PT risk index is calculated from the estimation of the life used and the strategic importance of the unit. The PT life used is estimated as a relationship of the solid insulation polymerization degree, where aging processes due to oxidation, hydrolysis, and pyrolysis are considered from the calendar date when the unit starts its operation until different future scenarios. For the calculation of the PT strategic importance, financial, security, environmental, and network performance aspects are considered. Then, using the optimization model, together with the CAPEX and the available budget over a planning time, a strategy for optimally replacing the critical units is determined. The model was applied for a group of 102 units, demonstrating its applicability and effectiveness. The developed methodology serves to support the manager of these assets in making decisions in the long term.
Publisher
Institution of Engineering and Technology (IET)
Subject
Electrical and Electronic Engineering,Energy Engineering and Power Technology,Control and Systems Engineering
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献