1. EirGrid SONI: ‘All island TSO facilitation of renewables studies’ 2010. Available athttp://www.eirgridgroup.com/site‐files/library/EirGrid/Facilitation‐of‐Renewables‐Report.pdf accessed 11 October 2017
2. BugdalR. DyskoA. BurtG.M.et al.: ‘Performance analysis of the ROCOF and vector shift methods using a dynamic protection modeling approach’.Presented at the 15th Int. Conf. on Power System Protection Bled Slovenia 2006 pp.139–144
3. ‘Health and Safety at Work etc. Act 1974’. Available athttp://www.legislation.gov.uk/ukpga/1974/37/contents accessed 21 June 2016
4. EirGrid SEMO SONI: ‘DS3: system services valuation further analysis – report to the SEM committee’ 2014. Available athttps://www.semcommittee.com/sites/semcommittee.com/files/media‐files/SEM‐14‐059a%20TSO%20Report%20Demand%20Analysis%20DS3%20System%20Services.pdf accessed 11 October 2017