Affiliation:
1. Universidad Autónoma del Estado de Hidalgo y Instituto Tecnológico y de Estudios Superiores de Monterrey (México)
Abstract
Aggregate production plans play a very important role in the industry, typically being carried out in periods of 3 to 18 months, Jamalnia et al. These plans determine optimal levels of production, hiring, firing, inventory, delays, subcontracting, etc. Zanjani et al. A multi-stage stochastic model was developed and applied to the aggregate production planning of a furniture company where the random variable is production capacity.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献