CALCULATION OF THE AMOUNT OF WORKON A TYPICAL TECHNOLOGICAL PARKING AREA LOT OF AN EXCAVATOR FOR BUILDING AN INFORMATION MODEL

Author:

Kabanov V. N.

Abstract

Statement of the problem. The construction of information models of construction processes is impossible without an accurate calculation of the amount of work performed on a typical technological parking lot (gripper). The aim of the work is to automate the computational procedures used to calculate the amount of excavation work on a typical technological excavator parking lot, which is used in 4D and 5D BIM models.Results. Analytical equations are obtained for calculating the volume of earthworks at one technological site of an excavator, taking into account the technical characteristics of earthmoving machines, as well as the conditions of work (the category of soil according to the value of the internal friction angle). Conclusions. The analytical dependences of the volume of work on one typical technological site of an excavator on the technical characteristics and operating conditions (the category of soil) can be used to form procedures for automatically calculating the volume of work, the duration and cost of the construction of pits. The amount of work on a single technological gripper can be used to form, evaluate and select the trajectory of the excavator during the construction of the pit.

Publisher

Voronezh State Technical University

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3