1. Use of Fixatives to Accelerate Building Decontamination and Decommissioning (D&D);T B Conley;Waste Management Conference,2009
2. Decontamination Techniques and Fixative Coatings Evaluated in the Building 235-F Legacy Source Term Removal Study;W Farrell;Savannah River Site,2005
3. Radiological controls for plutonium contaminated process equipment removal from 232-Z contaminated waste recovery process facility at the plutonium finishing plant (PFP) (No. HNF-33983-FP Rev 0);M Minette;Hanford Site (HNF),2007
4. Wide-area decontamination in an urban environment after radiological dispersion: A review and perspectives;M D Kaminski;Journal of hazardous materials,2016