Author:
Guan Hao,Wang Mengtong,Meng Qiang
Reference37 articles.
1. Minimizing cycle time in a blocking flowshop;I N K Abadi;Oper. Res,2000
2. Vessel scheduling with pilotage and tugging considerations;O Abou Kasm;Transp. Res. Pt. E-Logist. Transp. Rev,2021
3. Disjunctive constraints for manufacturing scheduling: Principles and extensions;P Baptiste;Int. J. Comput. Integr. Manuf,1996
4. No-wait and blocking job-shops: Challenging problems for GA's;C A Brizuela;Proceedings of the IEEE International Conference on Systems, Man and Cybernetics (SMC),2001