1. Grout-filled pipe splices for precast concrete construction;A Einea;PCI journal,1995
2. JGJ 1-2014, Technical specification for precast concrete structures;Ministry of Housing and Urban-Rural Development of China,2014
3. Experimental study on effects of grouted defects on behaviors of grout sleeve splicing and specimens;L Zheng;China Academy of Building Research,2018
4. Experimental study on influence of grouting defect on joint strength of grout sleeve splicing of rebars;X Li;Building Structure,2018
5. Experimental bond behavior of deformed rebars in halfgrouted sleeve connections with insufficient grouting defect;F Xu;Construction and Building Materials,2018