Author:
Wang Xiangyu,Liu Hai,Meng Xu,Cui Jie,Du Yanliang
Reference32 articles.
1. Repairing a shield tunnel damaged by secondary grouting;J.-L Liu;Tunnelling and Underground Space Technology,2018
2. GPR evaluation of the damaoshan highway tunnel: A case study;L Xiang;Ndt & E International,2013
3. Application of GPR in rebar detection of building structures;B Li;IOP Conference Series: Earth and Environmental Science,2021
4. An innovative vehicle-mounted GPR technique for fast and efficient monitoring of tunnel lining structural conditions;Y Zan;Case Studies in Nondestructive Testing and Evaluation,2016