Author:
Hakimzai Mubarak Shah,Zaheer Naeemullah,Saberi Saber Shah
Abstract
Development-induced displacement projects mainly involved locations with informal settlements, especially slum and squatter areas which left behind many socioeconomic impacts on displacement households. This forced displacement has caused breaking living patterns and social networks, destroying economic status, increasing infectious diseases, and other severe health problems. Many development projects, such as dam projects, airports, and road projects, have been implemented since 2001 in Afghanistan. The Kabul-Logar Road extension project, located on the southern side of Kabul city, has foreseen will destroy the existing socioeconomic status of Qalacha Khamdan's dwellers. Therefore, this paper examines the socioeconomic impacts of development-induced displacement on informal settlements in Qalacha Khamdan by the Kabul-Logar Road extension project. Data has been collected through site observation, questionnaires survey of heads of families affected, interviews with key informants, committees’ members, and some data from Cernea's model (IRR). The finding shows that the displaced population has lost social cohesion, social ties, close connectivity with brothers, relatives and neighbourhoods, businesses, valuable lands and well-designed homes. Finally, this study argues for more government and private sector involvement to manage the socioeconomic impacts of development-induced displacement after displacement.
Reference39 articles.
1. Abebe, F. K. (2011). Modelling informal settlement growth in Dar es Salaam, Tanzania. MSc Thesis. University of Twente,The Netherlands, p.110.
2. Ahmadi, A. S., & Kajita, Y. (2017). Evaluation of urban land development direcction in kabul city, Afghanistan. World Academy of Science, Engineering and Technology International Journal of Urban and Civil Engineering, 11(2), 152–162.
3. Amiri, B. A., & Lukumwena, N. (2018). An Overview of Informal Settlement Upgrading Strategies in Kabul City and the Need for an Integrated Multi-Sector Upgrading Model. Current Urban Studies, 06(03), 348–365. https://doi.org/10.4236/cus.2018.63019
4. Andnet, G. (2017). Causes of big development projects: Development- induced displacement and its socio-economic impacts on displaced people in Tekeze Dam. International Journal of Sociology and Anthropology, 9(9), 114–130. https://doi.org/10.5897/ijsa2015.0622
5. Berner, E. (2001). Learning from informal markets: Innovative approaches to land and housing provision. Development in Practice, 11(2–3), 292–307. https://doi.org/10.1080/09614520120056423