Tensioning Process of Sanhao Arch Pylon Cable-Stayed Bridge

Author:

Dong Xu,Bin Chen,Lei Liu

Abstract

<p>Sanhao cable-stayed bridge located in Liaoning Province of China features an impressive arch pylon system including two inclined steel arch ribs laterally across the bridge deck. The two 60m- high arch ribs stretches out from the same base on the main pier foundation and separates up to 55m at the top, which have the appearance of two tennis rackets. Ten pairs of longitudinal cables on both sides connect these two “tennis rackets” forming a triangle pylon system. Twenty pairs of inclined stay cables link the steel arch pylon and the prestressed concrete deck, which carry the self-weight of the deck and service loads. The tensioning process of the horizontal and inclined stay cables, especially the tensioning process of the individual strands for each cable, is the most challenging work of the bridge construction for achieving a sustainable structure, characterized by the smooth lines of the arch pylons and bridge deck, the safe stress of the steel arch ribs and the crack-free prestressed concrete deck.</p>

Publisher

International Association for Bridge and Structural Engineering (IABSE)

Reference4 articles.

1. Hambly, Bridge Deck behaviour, London:1976, pp.30-103.

2. Haifan Xiang, Rucheng Xiao, Cable Force Optimization of the Cable-Stayed Bridge with Influence Matrix Method, Beijing:1998

3. Lichu Fan, Bridge Engineering, Beijing:2001, pp.238-358.

4. Runshui Zhan, Sustainable Development of Bridge Construction, Beijing:2004

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3