Incremental Launching Method in a challenging geography: Ahmetbeyli-Fuzuli-Şuşa Motorway Project

Author:

Aygen Sinan1,Solak Okan1,Koru Burak1,Gedik Mustafa2,Özel Cemal Noyan3,Karayiğit Hatice3,Güler Cankat3

Affiliation:

1. PROYAPI Engineering and Consultancy Inc, Kuwait City, Kuwait

2. PROYAPI Engineering and Consultancy Inc, Ankara, Turkey

3. Freysaş Freyssinet Yapı Sistemleri San. A.Ş., Istanbul, Turkey

Abstract

<p>In 2021 important highway projects started to be implemented in the Karabakh region by the Azerbaijani government. As a part of 81 km Ahmetbeyli-Fuzuli-Shusha Motorway project, three viaducts (V6, V7, and V8) were built using the Incremental Launching Method (ILM). Karabakh is a mountainous region having a challenging geography for roadway construction. At the beginning of the project the three viaducts were designed as classical precast beam structures. Nevertheless, due to the deep valleys where the viaducts are located and the very tight construction schedule, the ILM was eventually retained, considering its advantages in terms of cost and works duration. V6 Left and Right Viaducts have a total length of 295m, V07 Right Viaduct of 185m, V07 Left Viaduct of 130m, V8 Right Viaduct of 350m and V8 Left Viaduct of 405m, with a central span of 55m. The six viaducts have minimum 4.2% and maximum 4.7% longitudinal slope. Due to their geographical conditions and possible access, it has been decided to launch four viaducts (V6 Left, V6 Right, V8 Left, V8 Right) downward and two (V7 Left, V7 Right) upward. Launching decks with such a high longitudinal slope was significant challenge, and special braking system were designed to withstand the sliding forces. In addition, V7 Right and Left viaducts required a particular design, not only because of their longitudinal slope, but also because of their small radius in the highway plan. For these viaducts, the precast sites were specially designed in accordance with the radius of the road requiring two launching jack locations. The guiding devices were resized according to the transverse horizontal forces due to the radius. During the construction, a kinematic study was prepared to determine the locations of the temporary supports on the piers according to each launching stage. Lead Rubber bearings (LRB) were used for the substructure design of the viaducts located in a significant earthquake zone, reducing the earthquake loads and limiting the displacements. Details of the permanent and temporary structures used in the construction phase of these viaducts will be detailed in this paper.</p>

Publisher

International Association for Bridge and Structural Engineering (IABSE)

Reference5 articles.

1. A. Pipinato, "The history, aesthetics, and design of bridges, (2016) "Innovative Bridge Design Handbook: Construction, Re-habilitation and Maintenance, A. Pipinato, Ed., Butterworth-Heinemann, Oxford, UK.

2. Improved Optimization Formulations for Launching Nose of Incrementally Launched Prestressed Concrete Bridges;Arturo N. Fontan;Journal of Bridge Engineering (ASCE)

3. LaViolette, M., Wipf, T., and Lee, Y., (2007) "Bridge Construction Practices Using Incremental Launching", American Association of State Highway and Transportation Officials, AASHTO, Ames, Iowa.

4. Specific design problems related to bridges built using the incremental launching method;M.E. Marchetti;Engineering Structures

5. Application of Computer Simulation To Construction of Incremental Launching Bridges;Mohamed Marzouk;Journal of Civil Engineering and Management

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3