1. BILISZCZUK J., BARCIK W., ONYSYK J., SZCZEPANSKI J., TOCZKIEWICZ R., TOMICZEK M., TUKENDORF A., TUKENDORF K.: "Technological aspects of construction of a concrete cable-stayed bridge along the highway ring road of Wrocław", Proc. of fib Symposium "Concrete engineering for excellence and efficiency", Prague, June 8-10, 2011, pp. 427-430.
2. Construction of Long Viaducts with the Use of Various Technologies;Jerzy Onysyk
3. WIERZBICKI S., SIENNICKI M., PRZYBYLSKI K., PIETRAS J., GIZEJOWSKI M.: "Support structures to pull bridge over the canal lock "Redzinskie" in Wroclaw - design and execution aspects", Proc. of 12th International Conference on Metal Structures ICMS 2011, Wroclaw, June 15-17, 2011, pp. 286-287.
4. BILISZCZUK J., BARCIK W., ONYSYK J., SADOWSKI K., TOCZKIEWICZ R., TUKENDORF K.: "Use of prefabricated elements in structural and architectural designing of concrete bridge superstructures", Proc. of 7th Central European Congress on Concrete Engineering, Balatonfured, September 22-23, 2011, pp. 319-322.