Abstract
<p>We live in a world of ultimately limited resources and as engineers we are responsible for the most efficient use of those resources. The needs of the societies we serve change and our infrastructure is under constant pressure to adapt to new requirements. Many of these demands are about capacity and drive a desire to replace existing structures with bigger and seemingly better designs. And whereas it's always nice to start with a clean sheet when preparing a design it is an obligation upon us engineers to make the most effective use of what is already there. Only in this way can we start to tackle the sustainability challenge brought upon us by the climate emergency. There are many ways that existing infrastructure can be used and repurposed so that the changing demands can be met.</p><p>The keynote paper will address the way in which existing bridge infrastructure has been adapted and expanded to meet the requirements of greater structural capacity.</p>
Publisher
International Association for Bridge and Structural Engineering (IABSE)
Reference5 articles.
1. Reid N., The Auckland Harbour Bridge clip- ons, planning disaster… or best practice?GreaterAuckland.org.nz May 5, 2021
2. Flint A.R. Strengthening and refurbishement of Severn Crossing. Proc.. Instn Civ. Structs & Bldgs 1992 94 Feb 7 -22
3. Reis A.J. and Pedro J.O. Railway installation on the Tagus suspension bridge in Lisbon,Portugal IABSE
4. Percy R. and Robinson P. The Tale of EJ Whitten Bridge e-mosty 04/2018 December
5. Archer Jones, C. and Green D.N Carbon targets for bridges: a proposed SCORS-style rating scheme. The Structural Engineer, Volume 99, Issue 10, 2021