Schotte Ken,De Backer Hans,Nuttens Timothy,De Wulf Alain,Van Bogaert Philippe
Abstract
<p>The Diabolo-project aims to improve the northern railway connectivity of Brussels Airport by 2012. As an important part of this project, a 1084 m long twin tube tunnel was shield driven below the airport runways and taxi-lanes using the mixshield method. During construction of both tunnel shafts, measurements have been carried out at several cross-sections of the tunnel lining. Each monitored ring was equipped with several strain gauges, distributed across the ring perimeter. The practical implementation of the strain gauges and measurement apparatus is explained and the first preliminary results of the completed measurements are presented. Finally a comparison will be made between the strain gauge measurements and extensive ovalisation measurements carried out at identical cross-sections.</p>
Publisher
International Association for Bridge and Structural Engineering (IABSE)
Reference3 articles.
1. , 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008
2. DE BACKER H., "Uitvoering van Rekmetingen op 12 Secties van Boortunnel KW 12 - Verslag", 2009.
3. DE WULF A., "Summarizing Report on the Monitoring of Tube B", Diabolo-Project 2009, Zaventem (Belgium) – Ovalisation Monitoring on Tunnel Segments, 2009.
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献