Author:
El Shenawy El Araby,Schlaich Mike
Abstract
<p>The stay cables for cable-stayed bridges are normally designed to get the bridge deck to behave under dead load, as a continuous beam on rigid supports. Consequently, the creep effect due to bending of the deck elements under dead load, can be eliminated and the achieved stay cable forces and the bridge alignment will not change with time.</p><p>Whilst the methods for the determination of the stay cable forces under dead load for cable- stayed bridges have been dealt with in several previous researches, it has been found that these methods cannot be applied for extradosed bridges.</p><p>In this paper, the common method used for the determination of the stay cables forces under dead load for cable-stayed bridges will be briefly discussed and a new method for the same purpose will be presented for extradosed bridges.</p>
Publisher
International Association for Bridge and Structural Engineering (IABSE)
Reference6 articles.
1. Mathivat, J.: The Cantilever Construction of Prestressed Concrete Bridges. English translation by C. J. Emberson, John Wiley & Sons, 1983.
2. Kasuga, A.: Extradosed bridges in Japan. Structural Concrete, 7, 2006.
3. Schlaich, M.: Erection of Cable Stayed Bridges Having Composite Decks With Precast Concrete Slabs. Journal of Bridge Engineering September/October 2001, PP. 333-339, 2001.
4. Svenson, H.: Cable-Stayed Bridges/ 40 Years Experience Worldwide. Ernst & Sohn, 2012.
5. Maxfield, B.: Engineering With Mathcad, Using Mathcad to Create and Organize your Engineering Calculations. Butterworth-Heinemann, Oxford, UK, 2006.
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献