Key Technology for Planning and Construction of Automated Production Lines in Large Bridge Factories

Author:

Sun Hai-peng1,Song Jun2

Affiliation:

1. Anhui Transportation Holding Group Co., Ltd., Hefei, China,230088.

2. Tongji University, Shanghai, China

Abstract

<p>Prefabricated bridges are one of the key means to realize industrialized bridge construction. Tradi- tionally, bridge components are produced in temporary prefabricated girder yards serving a single specific project, which produce prefabricated components with limited use and low utilization rate. Therefore, the construction of permanent prefabricated production bases has gradually become the trend of the highway bridge industry. This paper discusses the planning method and construction technology of permanent precast production plants for different concrete members of highway bridges. The construction method of bridge precast plants in terms of production line selection, equipment selection and application is introduced. Eventually, the key technologies for the auto- mated production lines and construction of large bridge precast factories are systematically estab- lished to provide reference for the construction of highway bridge precast factories.</p>

Publisher

International Association for Bridge and Structural Engineering (IABSE)

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3