Hidayat Taufiq,Mulyati Heti,Andrianto Mokhamad Syaefudin
Abstract
ABSTRACTNickel industry is one of the industry that potentially to increase foreign exchange. PT Antam Tbk UBPN Southeast Sulawesi has land area about 169.194,937 m2 with 14.452,85 m2 of buildings in FeNi Plant 3. In producing nickel, PT Antam Tbk UBPN Southeast Sulawesi requires a more optimum layout and material flow pattern. The objective of this research was to analyzed the layout of production and material handling in the FeNi Plant 3. The methods used in this study were relationship analysis of production activity and Assembly Line Balancing. The result showed that the current ferronikel flow layout and flow pattern is shaped a straight line, and efficiency assembly line balansing about 71,25 percent.Keywords: assembly line balancing, ferronickel, material flow pattern, layout production.ABSTRAKIndustri pengolahan nikel merupakan salah satu industri yang berpotensi menambah devisa negara. PT Antam Tbk UBPN Sulawesi Tenggara memiliki luas lahan sekitar 169.194,937 m2 dengan luas bangunan di FeNi Plant 3 sekitar 14.452,85 m2. PT Antam Tbk UBPN Sulawesi Tenggara dalam memproduksi nikel memerlukan tata letak dan pola aliran bahan yang lebih optimum. Tujuan penelitian yaitu menganalisis tata letak produksi dan pola aliran bahan feronikel di FeNi Plant 3 serta efisiensi keseimbangan lini perakitan. Metode yang digunakan adalah observasi dan analisis hubungan kedekatan aktivitas produksi dan keseimbangan lini perakitan. Hasil penelitian menunjukkan tata letak dan pola aliran bahan feronikel saat ini berbentuk garis lurus, serta efisiensi keseimbangan lini perakitan sebesar 71,25 persen.Kata kunci: feronikel, keseimbangan lini perakitan, pola aliran bahan, tata letak produksi.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献