1. 1) J.H.Bae,J.H.Cha,S.Ha,K.O.Kim,H.C.Song,C.S.Shim,S.C.Lee and K.S.Byun:Integrated simulation framework for offshore installation operations considering various ocean environment, Proceedings of 28th International Ocean and Polar Engineering Conference, Sapporo, Japan, pp.1000-1003, 2018.
2. 2) I.Winsen and R.Dijk:Quad lift : Enabling lifting of larger integrated topsides, Proceedings of 38th International Conference on Ocean, Offshore and Arctic Engineering, Glasgow, Scotland, UK, OMAE2019-95375, 2019.
3. 3) E.Harmsen, R.Dijk and P.Stuberg:DP-stability during heavy lift operation using a modified kalman filter, Proceedings of 37th International Conference on Ocean, Offshore and Arctic Engineering, Madrid, Spain, OMAE2018-77901, 2018.
4. 4) B.W.Nam, N.W.Kim, Y.M.Choi, S.Y.Hong and J.W.Kim:An experimental study on deepwater crane installation of subsea equipment in waves, Proceedings of 25th International Ocean and Polar Engineering Conference, Hawaii, USA, pp.1279-1283, 2015.
5. 5) B.W.Nam, N.W.Kim, S.Y.Hong:Experimental and numerical study on coupled motion responses of a floating crane vessel and a lifted subsea manifold in deep water, International Journal of Naval Architecture and Ocean Engineering, volume 9, issue 5, pp.552-567, 2017.