Abstract
Requirement defects are one of the major sources of failure in any software development process, and the main objective of this chapter is to make requirement analysis phase exhaustive by estimating risk at requirement level by analyzing requirement defect and requirement inter-relationships as early as possible to using domain modeling to inhibit them from being incorporated in design and implementation. To achieve this objective, this chapter proposes a tool to assist software developers in assessing risk at requirement level. The proposed tool, software risk estimator, SERIES in short, helps in early identification of potential risk where preventive actions can be undertaken to mitigate risk and corrective actions to avoid project failure in collaborative manner. The entire process has been supported by a software case study. The results of the proposed work are promising and will help software engineers in ensuring that all business requirements are captured correctly with clear vision and scope.
Reference44 articles.
1. Determination of Risk During Requirement Engineering Process.;S.Amber;International Journal of Emerging Trends in Computing and Information Sciences,2012
2. A risk assessment model for collaborative support in software management
3. Goal-driven risk assessment in requirements engineering
4. Beizer, B. (1990). Software testing techniques (2nd ed.). New York, NY: Van Nostrand Reinhold.
5. Software engineering: Risk features in requirement engineering.;S. N.Bhukya;Cluster Computing,2018