1. Agarwal, P. (2021, September 1). Losses narrow for Rex in FY2021, but forecasts challenging headwinds. https://www.aerotime.aero/28755-losses-narrow-for-rex-in-fy2021
2. Airport Council International. (2005). Building for the future:Paying for the airports of tomorrow. Airport Council International.
3. AshfordN.StantonH. P.MooreC.CoutuP.BeasleyJ. (2013). Airport operations. McGraw-Hill Education.
4. Asian Aviation. (2021, August 12). Australian regional carrier Rex says staff furloughs coming as COVID-19 lockdowns continue.https://asianaviation.com/australian-regional-carrier-rex-says-staff-furloughs-coming/
5. Australian Airport Association. (2016). Regional airport infrastructure study: Economic contribution and challenges of regional airports in Australia. Commissioned by the Australian Airport Association to ACIL Allen Consulting. https://airports.asn.au/wp-content/uploads/2018/05/AAA-regional-airport-study-final-report-September-2016.pdf