Ongoing Project Performance Improvements

Author:

Abstract

This chapter is purposed to improve the performance of an ongoing project taking into consideration time and cost. The short film project is fully established in Microsoft™ Project 2000, which is the initial plan. The project is started, and the completion of Task-22 is captured in Task-22-Completed-Plan. The completion of Task-30 is also captured in Task-30-Completed-Plan. Simulation is applied to all three plans in order, one by one, to calculate time, cost, and associated risks. The simulation results of a plan are compared with the next plan which includes actual values for completed tasks. The objective of this process is to achieve the most accurate solution, which will gradually improve the ongoing project performance. In conclusion, the ongoing project performance is increasingly improved by gradually achieving risk reduction and the most accurate solution. Therefore, the objective is accomplished.

Publisher

IGI Global

Reference12 articles.

1. APM. (2015). Planning, Scheduling, Monitoring, and Control: The Practical Project Management of Time, Cost and Risk. Association for Project Management.

2. Averous, J., & Linares, T. (2015). Practical Schedule Risk Analysis, 1st edition. Fourth Revolution Publishing.

3. BernsteinP. L. (1996). Against the Gods: The Remarkable Story of Risk. John Wiley & Sons.

4. ChatfieldC.JohnsonT. (2016). Microsoft Project 2016 – Step by Step. Microsoft Press.

5. ChatfieldS. C.JohnsonT. D. (2000). Microsoft Project 2000 – Step by Step. Microsoft Press.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3