Factors Causing Project Cost Overrun in the Telecommunications Industry in Oman

Author:

Al Zadjali Zahra A.1,Bashir Hamdi A.2,Maqrashi Ali A.3

Affiliation:

1. Oman Telecommunication Company (Omantel), Muscat, Oman

2. Department of Industrial Engineering and Management, University of Sharjah, Sharjah, UAE

3. Albanah Global LLC, Muscat, Oman

Abstract

Several studies have been carried out to investigate the causes of project cost overrun in different industries worldwide. This paper reports on the results of a study investigating the factors causing project cost overrun in Oman. Data required for this study were collected from 44 project engineers and managers of client and contracting companies involved in telecommunications projects. According to the analysis of results, 14 out of 37 factors are identified as major causes of project cost overrun. While most of the identified factors could affect any types of projects carried out in any country, one of the factors, namely lengthy tendering process might be unique to the projects carried out in Oman. Moreover, this study investigates the association between company size in terms of number of employees and causes of project cost overrun. The results show that there is no strong evidence to suggest that the causes of cost overrun differ significantly according to company size.

Publisher

IGI Global

Subject

Management of Technology and Innovation,Information Systems and Management,Organizational Behavior and Human Resource Management,Strategy and Management,Communication,Management Information Systems

Reference43 articles.

1. Quality management in large versus small firms.;S.Ahire;Journal of Small Business Management,1996

2. Cost performance for building construction projects in Klang Valley.;A. S.Ali;Journal of Building Performance,2010

3. Significant factors causing cost overruns in telecommunication projects in Nigeria.;O. J.Ameh;Journal of Construction in Developing Countries,2010

4. Azhar, N., Farooqui, R. U., & Ahmed, S. M. (2008, August). Cost Overrun Factors in Construction Industry of Pakistan. Paper presented at the First International Conference on Construction in Developing Countries, Karachi, Pakistan.

5. Modeling of development time for hydroelectric generators using factor and multiple regression analyses

Cited by 6 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. A comprehensive assessment of time overruns in Ghanaian telecom cell site construction;Cogent Engineering;2022-08-17

2. The Influence of Probability Discounting on Escalation in Information Technology Projects;International Journal of Information Technology Project Management;2018-01

3. An Introduction to Project End Theory in Project Management;International Journal of Information Technology Project Management;2017-07

4. Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects;Engineering, Construction and Architectural Management;2017-01-16

5. Managing an Engineering Project;International Journal of Information Technology Project Management;2016-01

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3