The Risks of Construction PPP Projects in Palestine

Author:

Mousa Kawther1ORCID,Zhang Zenglian1,Sumarliah Eli2ORCID

Affiliation:

1. University of Science and Technology Beijing, China

2. Al-Ihya Islamic University, Indonesia

Abstract

Many developing nations, such as Palestine, implemented PPP (public-private partnership) to fulfill the increasing needs for public services and facilities. Nonetheless, PPP projects have numerous risks which influence each other and can cause project failures. Unfortunately, current studies related to the PPP risk association have not provided adequate details. This paper tries to fill the literature gap by proposing a practical approach in analyzing the relationship among PPP risks. First, the research identifies risk for PPP projects in the Palestinian construction industry by integrating the interviews and literature review. Next, this study reflects the associations among the risks and reveals the failure instruments of PPP projects using FISM (fuzzy interpretative structural modeling). Besides, this paper uses MICMAC (matrix impact cross-reference multiplication applied to a classification) and FISM method to discover and finalized the 19 crucial risk elements. The MICMAC-FISM approach reckons the fuzzy of the PPP risk association and enhances upon previously published works.

Publisher

IGI Global

Subject

Information Systems and Management,Management Science and Operations Research,Strategy and Management,Information Systems,Management Information Systems

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3