Affiliation:
1. Autonomous University of Ciudad Juarez, Mexico
2. Autonomous University of Baja California, Mexico
Abstract
At present, the manufacturing industries require the implementation of more efficient and flexible fabrication processes to offer high-quality products. The changeover methodologies can be used to reduce the setup times, allowing the industries to be more competitive. The application of changeover methodologies is mainly influenced by the 4Ps model, which is composed of organizational and design factors, such as people, practices, product, and processes. However, this model is not useful in determining the relationship between each one of the Ps and the changeover activities. In this chapter, the authors have developed an exhaustive review of the references to establish the indicators to design an instrument composed of 79 items and divided into the five constructs of the 4P model, which was statistically validated using the Kendall W indicator and the Cronbach´s alpha indicator.
Reference44 articles.
1. Abhijeet, Abhishek, Akash, Abhishek, & Swapnil. (2016). Set up time reduction by using SMED and Kaizen approach. Academic Press.
2. Adanna, I. W., & Shantharam, A. (2013). Improvement of Setup Time and Production Output with the use of Single Minute Exchange of Die Principles. Academic Press.
3. SMED (Single-Minute Exchange of Die) methodology in Garment manufacturing Industry : Case study in reducing Style Change over;J. D.Bajpai;Time,2014
4. The use of SMED to eliminate small stops in a manufacturing firm
5. Set-up time reduction process and integrated predetermined time system MTM-UAS: A study of application in a large size company of automobile industry
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献