Affiliation:
1. KPR Institute of Engineering and Technology, India
Abstract
In this chapter, the authors explore a cost model and the come about cost-minimization client booking issue in multi-level mist figuring organizations. For an average multi-level haze figuring network comprising of one haze control hub (FCN), different fog access nodes (FANs), and user equipment (UE), how to model the cost paid to FANs for propelling assets sharing and how to adequately plan UEs to limit the cost for FCN are still issues to be settled. To unravel these issues, multi-level cost model, including the administration delay and a straight backwards request dynamic installment conspire, is proposed, and a cost-minimization client planning issue is defined. Further, the client planning issue is reformulated as an expected game and demonstrated to have a Nash equilibrium (NE) arrangement.