Finite Capacity Material Requirement Planning System for a Three-Stage Supply Chain Under Manufacturer-Managed Scheduling Concept

Author:

Paopongchuang Benyaphorn1ORCID,Yenradee Pisal1ORCID

Affiliation:

1. Sirindhorn International Institute of Technology, Thammasat University, Thailand

Abstract

Supply chain management (SCM) is critical to the success of manufacturing industries. Advanced production planning and scheduling functions capable of coping with activities in a supply chain (SC) are presently needed. A finite capacity material requirement planning (FCMRP) system for a three-stage SC, defined as “3-SC FCMRP,” is presented herein. The system aims to generate feasible production and transportation schedules for the SC based on the manufacturer-managed scheduling concept, which allows the main manufacturer to manage the production schedule by considering the finite capacities of the factory work centers, suppliers, as well as customers. The system is based on a modular design concept that allows each module to be modified easily and independently. Experimental results show that all subsystems have statistically significant effects on the total cost of the SC, and schedules generated by the 3-SC FCMRP system are more realistic than those generated by the FCMRP system for the single or two-stage SC.

Publisher

IGI Global

Subject

Artificial Intelligence,Management of Technology and Innovation,Information Systems and Management,Organizational Behavior and Human Resource Management,Strategy and Management,Information Systems

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3