Analysis and Improvement of Late Completion of Aircraft Engine Maintenance Using Fuzzy PERT/CPM With Limited Resources

Author:

Ramadhanti Lifia Citra1,Yenradee Pisal1ORCID

Affiliation:

1. Sirindhorn International Institute of Technology, Thammasat University, Thailand

Abstract

This paper aims to develop a method to analyze causes and to solve a late completion problem of aircraft engine maintenance jobs in a maintenance, repair, and overhaul (MRO) company. It applies fuzzy PERT/CPM methods that can determine realistic completion times and a schedule of engine maintenance jobs and develops a fuzzy resource requirement (FRR) method to determine whether the available resources are enough to conduct the maintenance activities according to the schedules. A case study is conducted in an MRO company in Indonesia. The results show that when the fuzzy activity times are estimated from real data, the fuzzy PERT/CPM methods can accurately predict the completion times of engine maintenance jobs. However, most jobs have high possibility to be completed late. Corrective actions are proposed to reduce activity times of five activities to make all maintenance jobs completed on time. Moreover, the developed FRR method is effective to evaluate that current available resources are sufficient to conduct all maintenance activities according to the schedules.

Publisher

IGI Global

Subject

Artificial Intelligence,Management of Technology and Innovation,Information Systems and Management,Organizational Behavior and Human Resource Management,Strategy and Management,Information Systems

Reference35 articles.

1. Project planning and scheduling using PERT and CPM techniques with linear programming.;W.Agyei;International Journal of Scientific & Technology Research,2015

2. Building project activities/tasks time scheduling using a linear programming model.;P. E.Amiolemhen;International Journal of Innovative Systems Design and Engineering,2016

3. Aircraft Maintenance Planning Using Fuzzy Critical Path Analysis

4. A TOC-based load-planning procedure for scheduling activities in job-shops with tight resource constraints.;M.Catana;Proceedings of the 9th International Conference on Advanced Manufacturing Technologies,2015

5. Applying fuzzy method for measuring criticality in project network

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3