1. PAUL J, WEI J Y, BASA S, et al. The Chinese-French SVOM mission for gamma-ray burst studies[J]. Comptes Rendus Physique, 2011, 12(3): 298-308
2. CASTELLINI F, LAVAGNA M. Advanced planning and scheduling initiative’s XMAS tool: AI for automatic scheduling of XMM-Newton long term plan[C]//6 th International Workshop on Planning and Scheduling for Space. Pasadena: European Space Agency Publications Division, 2009
3. LU F J, ZHANG S N. Status of the hard X-ray modulation telescope (insight-HXMT) project[J]. Chinese Journal of Space Science, 2018, 38(5): 623-626
4. LI Xinqiao, WEN Xiangyang, AN Zhenghua, et al. The GECAM and its payload[J]. Scientia Sinica Physica, Mechanica & Astronomica, 2020, 50(12): 129508
李新乔, 文向阳, 安正华, 等. GECAM卫星有效载荷介绍[J]. 中国科学: 物理学 力学 天文学, 2020, 50(12): 129508
5. FRATINI S, CESTA A. The APSI framework: a platform for timeline synthesis[C]//Proceedings of the 1 st Workshops on Planning and Scheduling with Timelines. Atibaia: PSTL, 2012: 8-15