Passenger Safety in the Warsaw Metro. Research Report

Author:

Piec RobertORCID,Cisek MarcinORCID,Wróbel RafałORCID,Sowa MichałORCID,Wiechetek MarcinORCID,Gawroński WiktorORCID,Szykuła-Piec BarbaraORCID,Michalak KatarzynaORCID

Abstract

Aim: The article presents the results of research on the evacuation times of passengers of three different trains used by the Warsaw metro. In emergency situations on metro trains, fast and safe evacuation is crucial for saving passengers’ health and lives. Evacuation from the tunnels of the Warsaw metro can only take place properly on underground platforms. The key parameter determining passenger safety is required safe evacuation time. Project and methods: Four evacuation experiments were carried out. In the first experiment, people on the train left the train into the tunnel, walked towards the station and climbed the stairs to the platform level. The experiment ended when all people entered the platform level. In the second experiment, the passengers went to the end of the train. After a fixed sound signal, the persons moved along the train and went out onto the platform. The study ended when all the people entered the platform. Experiment 3 investigated the times when a certain number of people passed through one or more doors of the train. In experiment 4, the aim was to investigate the time of people walking along the platform and up the stairs to the mezzanine level. Results: The longest recorded average time of passage through the whole train is 133.5 s during longitudinal evacuation. The shortest recorded exit time is 9 seconds, evacuees were deployed throughout the car without restrictions. In the train of type 81, for technical reasons, no experiment was carried out consisting of moving along the entire train, and it should be noted that this train has separate, closed carriages and to walk through the whole train it would be necessary to open each door between the train. Conclusions: The data from experiments II and IV were combined and extrapolated taking into account the evacuation time for the maximum number of passengers who can occupy the trains, i.e. 1,500 people on the Inspiro train, 1,454 people on the Alstom train and 1,200 people on Type 81 train. The results of the experiment indicate that the longest passage time in very unfavourable conditions, when passengers have to pass the whole train and then exit the platform registered for type 81 train and is almost 433 seconds. For Inspiro and Alstom trains, the time is almost 25% shorter. Such a large difference in time is related to the way of connecting individual carriages – to move from car to car in type 81 train, it is necessary to open wo doors each time (from the abandoned car and the car to which you are passing), while this activity is not performed on Inspiro and Alstom trains.

Publisher

CNBOP-PIB Centrum Naukowo-Badawcze Ochrony Przeciwpozarowej

Reference10 articles.

1. A DETAILED CFD SIMULATION OF THE 2003 DAEGU METRO STATION FIRE

2. The King's Cross Underground fire and the setting up of the investigation

3. Saving Human Lives

4. Analiza przyczyny powstania pożaru pociągu Inspiro nr 52 Metra Warszawskiego;Kotulek G.;Zeszyty Naukowe SGSP,2018

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3