A Literature Review on Developing Causes and Mitigation Strategies of Delay in Construction Projects: Gaps Between Owners and Contractors in Successful and Unsuccessful Projects

Author:

Lokeshwaran M 1,Aswin Bharath A 1

Affiliation:

1. Kumaraguru college of Technology, Coimbatore, Tamil Nadu, India

Abstract

The construction industry is known for its high risk of project delays, which can lead to cost overruns and reduced project performance. This literature review examines the causes of delays in construction projects, as well as the mitigation strategies used by owners and contractors to address these issues. The study also explores the gaps between owners and contractors in successful and unsuccessful projects, highlighting the need for improved communication and collaboration between these two groups. The review found that the most common causes of delay in construction projects are design changes, poor project management, labour shortages, and material shortages. To mitigate these issues, owners and contractors employ various strategies, including scheduling and resource allocation, risk management, and project monitoring and control. The study also revealed that successful projects are characterized by effective communication and collaboration between owners and contractors, while unsuccessful projects often result from a lack of trust and cooperation. The review suggests that owners and contractors can improve project outcomes by establishing clear project goals, developing a shared understanding of project risks and requirements, and fostering open communication throughout the project lifecycle. Overall, this literature review highlights the importance of addressing the causes of delay in construction projects through effective mitigation strategies and improved collaboration between owners and contractors. By implementing these measures, stakeholders can improve project outcomes and reduce the risk of costly delays and overruns.

Publisher

Naksh Solutions

Subject

General Medicine

Reference37 articles.

1. Assaf, S. A., & Al-Haji, G. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349-357.

2. Al-Momani, A. H. (2016). Causes of delay in construction projects in Jordan. International Journal of Construction Engineering and Management, 5(4), 105-109.

3. Assaf, S. A., & Al-Hammad, A. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349-357.

4. Wang, S., & Liu, X. (2018). A study on the mitigation strategies for construction project delay in China. Advances in Civil Engineering, 2018,

5. Shubham, K. (2013). Causes and effects of delays in large construction projects. International Journal of Research in Engineering and Technology, 2(2), 368-373

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3