Review Paper on an Innovative Time-Cost-Quality Tradeoff Modeling of Building Construction Project Based on Resource Allocation

Author:

Mr. Niraj Londhe 1,Dr. Pratibha M. Alandkar 1,Prof. Pooja Sonawane 1,Dr. P. R. Bamane 2

Affiliation:

1. RMD Sinhgad School of Engineering, Pune, Maharashtra, India

2. Arvind Gavali College of Engineering, Satara, Maharashtra, India

Abstract

The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. Tradeoffs between project duration, total cost, quality and risk are extensively discussed in the project scheduling. This paper tries to develop a Time, Cost and Quality optimization model that enables managers to optimize multi objectives. The model is from the project break down structure method where task resources in a construction project are divided in to series of activities and further in to construction labors, materials, equipment and administration. Quality is an important parameter correlating highly with time and cost parameters .But it is not a quantitative in nature , practical time cost , quality tradeoff models are seldom developed from previous research works of the literature. Although the objectives of cost and time must be mentioned frequently by natural numbers. This paper will present a new solution for solving time, cost, and quality tradeoff problem based on project break down structure method and task resource allocation. The resource utilized in a construction activity would eventually determine its construction time, cost, quality tradeoff model is finally generated based on correlations between construction activities.

Publisher

Naksh Solutions

Subject

General Medicine

Reference7 articles.

1. Roya M.Ahari and S.T.A.Niaki “Fuzzy optimization in cost time and quality trade – off in software projects with Quality Obtained by Fuzzy Rule base” International journal of modelling and optimization vol.3 no.2 April 2015.

2. Rhuta Joshi1, Prof. V. Z. Patil2 “Resource Scheduling of Construction Project: Case Study International Journal of Science and Research (IJSR) ISSN (Online): 2319-7064.

3. SK. Nagaraju, B. Sivakonda Reddy, and Prof. A. Ray Chaudhuri “Resource Management in Construction Projects – a case study IRACST – Engineering Science and Technology: An International Journal (ESTIJ), ISSN: 2250-3498.

4. Ming Lu and Heng Li “Resource-Activity Critical-Path Method for Construction Planning” ASCE Library volume 4412.2.

5. Reza Ghodsi, Mohammad Reza Skandari, and Morteza Allahverdiloo, Seyed Hossein Iranmanesh “A New Practical Model to Trade-off Time, Cost, and Quality of a Project “Australian Journal of Basic and Applied Sciences, 3(4): 3741- 3756, ISSN 1991-8178.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3