Supplier Selection in Inventory Control Management while Procuring and Utilizing of Material in Construction Projects

Author:

Pritam A Mali 1,Raviraj V Jadhav 1,Kiran K Shinde 1

Affiliation:

1. Annasaheb Dange College of Engineering and Technology, Ashta. Maharashtra, India

Abstract

Inventory represents a huge proportion of the cost of construction. Inventory typically ordered in a week or maybe in the month prior to demand leading to uneconomical inventory on construction site. Construction inventory represents the cost to purchase, cost required to store and insure, cost to protect against theft, & cost incurred when inventory becomes obsolete. Major construction industries are attempting to adopt various business initiatives so as to remain alive incoming marketplace. The evaluation and selection of vendors is a very important task in any industry. For initiating the to adopt the most efficient ways so as to make sure the smooth flow of the execution of the project, thereby avoiding delay and cost overrun of projects. The paper is focusing on the efficient method for supplier selection for inventory and its procurement procedure, to avoid delay in construction projects. Also explained about extra cost spent on the procurement of different construction materials from various vendors, and remedies for the same by using a case study.

Publisher

Naksh Solutions

Subject

General Medicine

Reference14 articles.

1. Akshay A. Patil ,Prof. Madhav B. Kumthekar, “Supplier Evaluation and selection methods in construction industry” International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 03 Issue: 06 | June-2016.

2. David J. Edwards and Gary D. Holt, “Construction plant and Equipment management research: Thematic Review” 2014 International Journal of Engineering Science & Research Technology, Volume 4, Issue 1.

3. Hisham Said, Khaled EI-Rayes, “Optimizing material procurement and Storage on Construction sites” 2013 International Journal Science and Research, Volume 4 Issue 3.

4. Liulin Kong, Heng Li, Hanbin Luo, Lieyun Ding, Xiaoling Zhang “Sustainable performance of Just-In-Time (JIT) management in time-dependent batch delivery scheduling of precast construction” Journal of Cleaner Production: 22 August 2017.

5. Ma Zhiliang, Liu Zhe & Zhang Dongdong (2013), “An Integrated Mobile Material Management System for Construction sites” Journal of civil engineering and management Vol- 6, Issue no - 4.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3