VFT and AHP Approach to Selecting the Best Option in Decision-Making at PLN: A Case Study in the Cawang-Gandul Project

Author:

Winowoda Benaya,Wasesa Meditya

Abstract

PLN EIC is one of PLN’s business units and is responsible for the development of electrical infrastructure in the working area of DKI Jakarta, Banten Province, and its surroundings. One of the national strategic projects included in the PLN is the 500 kV Cawang Baru II/Cililitan-Gandul transmission line project, with a COD target of 2026. The delay in the completion of this project and the non-fulfillment of stakeholders’ expectations will certainly have a broad impact on the operation of the electricity system, the impact on PLN’s financial performance, the social impact, the environmental impact, as well as the direct impact on the performance and image of PLN EIC. This research aims to assist management in making decisions related to the best transmission line design for the Cawang-Gandul project so that project completion can be on time and in accordance with stakeholder expectations. In this research, several methodological approaches were used to gain a broader and more complete understanding. The Problem Tree Analysis approach, combined with brainstorming and structured interview techniques, was used to explore business issues. Two complementary approaches, namely Value-Focused Thinking (VFT) and the Stakeholder Analysis method, are used to formulate stakeholder expectations and will become guidelines for formulating alternative strategies. Using a structured interview technique, 4 alternative strategies were formulated in the form of the transmission line design, namely (1) Compact Lattice Tower, (2) Underground Cable, (3) Combine Design (Compact Lattice Tower + Underground Cable), and (4) Steel Pole Tower. The next methodological approach uses the Analytic Hierarchy Process (AHP) to determine the best transmission line design, which is then analyzed using AHP Super Decision software. The results of this research show that the Underground Cable design is the best design alternative that can be implemented in the Cawang-Gandul project with several advantages, namely minimal social conflict, easy implementation, and a relatively faster work process. The final stage of research is to make an implementation plan.

Publisher

European Open Science Publishing

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3