Affiliation:
1. WULS-SGGW Institute of Environmental Engineering
2. HBM Prenscia
3. Uniwersytet Przyrodniczy w Lublinie Katedra Inżynierii Środowiska i Geodezji
Abstract
of the Water Supply Plant WULS-SGGW (WSP). The Monte Carlo method was used to simulate
failure events of components in the technological process of the water treatment system. BlockSim
application was used to perform an analysis. The reliability block diagram was used as a system
modeling method. Reliability metrics were estimated based on 1000 simulations of 15 years of
operation of the station. Simulations allowed the estimation of reliability metrics for the WSP, its
subsystems, sections as well as basic elements included in the model. They also made it possible to
determine which components are most critical to reliability.
Reference35 articles.
1. Denczew S., Królikowski A., Basics of modern operation of water supply and sewage systems, ARKADY, Waesaw2002 (in Polish).
2. Herder P.M., van Luijk J.A., Bruijnooge J., Industrial application of RAM modeling development and implementation of a RAM simulation model for the Lexan plant at GE Industrial, Plastics, “Reliability Engineering & System Safety” 2008, 93: 501–508.
3. Sharma R.K., Kumar D., Kumar P., Performance modeling in critical engineering systems using RAM analysis, “Reliability Engineering & System Safety” 2008, 93: 891–897.
4. Młynarski S., Oprzędkiewicz J., System solutions ensuring safety and reliability of technical facilities, “Problemy Eksploatacji” 2012, 3: 39–54 (in Polish).
5. Dingzhou C., Yu S., Huairui G., Optimizing Maintenance Policies based on Discrete Event Simulation and the OCBA Mechanism, Reliability and Maintainability Symposium, January 2013.