Abstract
Abstract
In this paper one of the recently developed metaheuristic algorithms, the Cuckoo Search algorithm is used for the optimization of the operation of a large hydropower plant in Kurdistan, Iraq. The optimization problem is to realize an annual planned energy generation with monthly imposed fractions. The obtained results are excellent, nevertheless, there are some limitations of the algorithm determined by the initial level into the reservoir and a certain correlation between the type of the year, the starting level and the planned energy to be realized.