Author:
Sitepu Muhammad Haikal,McKay Alison,Alda Tania,Siregar Lamsihar,Irawan Ali Akbar
Abstract
Abstract
Availability of raw materials is important for maintaining the continuity of production. However, in planning inventory for raw materials, several factors such as availability of warehouse space for raw material, handling cost, order cost, transportation time are used in determining amount of raw material need to be stocked. Vise is important tool to support finishing process such as cutting and grinding. Vise consists of several parts such as base, right clamp body and handle. These parts need to be stored in warehouse to support the manufacturing of vise. Hence, the warehouse space must be adequate to store raw materials for manufacturing vise within certain period of time. This paper aims to demonstrate the calculation of warehouse area based on the material requirements that are calculated based on material removal rate for each process.
Reference5 articles.
1. Aplikasi Perhitungan Kebutuhan Bahan Baku Produksi Buku Lks dengan Metode Material Requirement Planning (MRP) Studi Kasus pada PT;Azzam
2. Inventory Planning at Painting Section in the Indonesian Automotive Industry;Sitepu,2019