Scrap Metal Reduction as the Effect of Combustor Upgrade in GTG 1.3 PLTGU Muara Karang

Author:

Leilan F,Revina T,Dimassetya I,Rahmanissa A

Abstract

Abstract Metal as one of the most common used materials in industry, needs a proper management for it will not contaminate the land. Metal waste, or also called scrap metals, is disposed in a scrap yard. To prevent the accumulation of scrap metals in the scrap yard area, reducing the generation of it is important. Especially when the auction procedure for scrap metals takes a long time. PLTGU Muara Karang had upgraded GTG 1.3 to Advanced Extendor Combustion System in October 2016 to improve its operational excellence. The impacts of upgrading gas turbine to Advanced Extendor Combustion System, are not only for better efficiency in performance, but also extending the maintenance interval up to 32000 hours. By extending the maintenance interval, combustion inspection, which is usually performed every 8000 hours, can be dismissed. The total maintenance duration needed also reduced from 120 days to 66 days on 8 years period. This leads to reducing metal waste generated during maintenance. By calculating the spare parts that required to be replaced in one combustion inspection, the metal waste reduction potential is 2.26 ton. For 8 years period, the combustor upgrade help to reduce metal waste generation about 75.02%.

Publisher

IOP Publishing

Subject

General Medicine

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3