Increase of the throughput and processing capacity of the railway line mountain pass section by strengthening the devices of the system of traction power supply

Author:

Astashkov N P,Olentsevich V A,Akhmetshin A R,Suslov K V,Shtayger M G,Karlina A I

Abstract

Abstract According to the forecast target indicators values of the JSC “Russian Railways” integrated development project until 2023, it is necessary to increase the East Siberian railway capacity of the mountain-pass section of the Bolshoy Lug – Slyudyanka-II up to 137 pairs of trains per day. The freight trains number should be 107 pairs per day, a raft of pushing locomotives in the odd direction up to 19 units. The section transportation capacity will increase to 116.7 million tons per year. According to the specified operation parameters, with the growth of cargo turnover on the Irkutsk – Slyudyanka section by 2023, the available capacity shortage will be 14 pairs of trains. In freight traffic, if all provided reserve lines of the the regulatory schedule are used, the capacity deficit will be 11 pairs of various categories trains. The article offers a solution of the existing section power supply devices strengthening problem until the inter-train interval of 8 minutes is reached, for this purpose, the technical parameters of the section substations are considered, and the performance indicators that can provide reliable and cost-effective working conditions are determined. The operation conditions of a traction power network (TPN) of the Bolshoy Lug – Slyudyanka-II section under the existing traffic schedule and under the prospective train schedule are compared. Traction calculations have a special role, since they serve as the basis for drawing up optimal train schedules, determining the railway lines capacity, effectively placing separate points, traction substations, fuel depots, determining the locomotives electricity and fuel consumption rate, solving other practical problems. Traction operation calculation of the electrified mountain pass section of the Bolshoy Lug – Slyudyanka-II railway line was performed using the KORTES software package. The power supply parameters of a given section were used as input data: the separate points number and location, the current speed limits for trains on this section, the longitudinal profile of the railway track, the categories and types of trains that pass through the section, the trains weights and the electric rolling stock types used in the calculation.

Publisher

IOP Publishing

Subject

General Medicine

Reference18 articles.

1. Methods for determining “Bottlenecks” limiting the throughput of railway lines;Kokurin;Bull. of the Petersburg University of Railways,2013

2. Set of organizational, technical and reconstructive measures aimed at improvement of section performance indicators based on the study of systemic relations and regularities of functioning of railway transport system;Olentsevich;IOP Conf. Ser.: Mater. Sci. Eng.,2019

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3