Author:
Korol Elena,Petrosyan Rima,Smirnova Nadezhda
Abstract
Abstract
Subject: The article investigates the parameters of the technological processes of arranging underground injection waterproofing from bentonite solutions for construction, reconstruction, and overhaul of buildings in cramped conditions, taking into account the features of mechanization of work, the number and qualifications of workers. Based on the results of the timekeeping studies carried out in experimental conditions, the costs of working time for performing technological operations on the arrangement of underground waterproofing with an injection compound from bentonite solutions were determined. Considering the identified technological features, the number and qualifications of workers have been established during the work on the arrangement of injection waterproofing from bentonite solutions.
Reference17 articles.
1. Methodological issues of the development of technological maps in construction for a modular house based on time observations [Text] / L. V. Kievsky;Kievsky;Industrial and civil construction.,2016
2. Kinetic investigations into the distillation of nonferrous metals during complex processing of waste of metallurgical industry;Kolesnikov;Russian Journal of Non-Ferrous Metals.,2015
3. Decorative and protective plates for facade finishing of buildings / Erofeev A V, Yartsev V P and Monastyrev P V Proceedings of higher educational institutions;Erofeev;Technology textile industry,2017
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献