Author:
Fadhlurrahman Z A,Yuniaristanto ,Hisjam M,Zakaria R
Abstract
Abstract
Futura Energy Nusantara is the first manufacturer of lithium-ion battery cell production in Indonesia. Because highly demand, the company must fill the order and increase production Productivity is one of the most fundamental and important determinants of system production. Productivity measurement help identify the problems and find solutions to improve system performance. OEE (Overall Equipment Effectiveness) is one method used for effective time manufacturing systems related to the existence of equipment in the production system. The Element of OEE is Availability Rate (A), Performance Efficiency (P), and Quality Rate (Q). The study aims to test through the simulation production system in Lithium-Ion Batteries (LIB), by considering factor OEE, with discrete event simulation system. As a result, this study is a model to applicable, for the company to improve Productivity
Reference14 articles.
1. Cross-functional team working for overall equipment effectiveness;Bamber;Journal of Quality in Maintenance Engineering,2003
2. The use of 5-WHYs technique to eliminate OEE’s speed loss in a manufacturing firm;Benjamin;Journal of Quality in Maintenance Engineering,2015
3. Implementation of total productive maintenance (TPM) in automotive industry;Bon,2011
4. Master Productions Scheduling with goal programming on lithium battery production:case study;Mursid;IOP Conference Series : Materials Science and Engineering 2019,2019
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献