Author:
Grosheva P Yu,Yudin A V,Myakishev Yu D
Abstract
Abstract
The paper is dedicated to the development of methods for predicting risk-based lifecycle resource provision in science-intensive projects. This method of whole-cycle prediction of changes in resource provision for science-intensive projects, which embraces risk factors, estimates appropriate real volumes of resource provision needed for engineering and producing science-intensive goods. It uses adaptive methods to estimate resource provision based on statistical data that is obtained at each phase of the project’s life cycle. The method enables prognosis of appropriate resource provision levels at different phases of the science-intensive project with consideration of risk factors. This method implies PC calculation. Minimal use of expert estimates is its crucial characteristic, as it enables automated computation.
Reference15 articles.
1. Management of Competitiveness;Chursin,2015
2. Innovation as a Basis for Competitiveness;Chursin,2016
3. From common to uncommon knowledge: foundations of firm-specific use of knowledge as a resource;Nag;Academy of Management Journal,2012
4. Minimum wages and firm profitability;Draca;Applied Economics,2011
5. Towards a capability theory of (innovating) firms: implications for management and policy;Teece;Cambridge Journal of Economics,2017
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Researching the processes determining the dominance of unique products in sales markets;XLIV ACADEMIC SPACE CONFERENCE: dedicated to the memory of academician S.P. Korolev and other outstanding Russian scientists – Pioneers of space exploration;2021