Author:
Oleinik Pavel,Kuzmina Tatyana,Zueva Diana,Balmashnova Mariya
Abstract
Abstract
The construction of facilities in hard-to-reach and underdeveloped areas is an extremely difficult task, the solution of which largely depends on the quality and timely development of the construction area. Significant reserves for reducing the territories pioneer duration are in the combination of the pioneer construction and preparatory periods. To this end, on the basis of a generalization of practical experience, a methodology for linking work is proposed, based on the found equations of communication between the scope of work, the intensity of consumption of labor and technical resources, and the duration of work. The options for changing the scope of work: from the minimum size of the work area per team to the full work area for the whole process are examined and the conditions for rational combination of the pioneer construction and preparatory periods are disclosed.
Reference12 articles.
1. Intensification of the investment process of construction;Oleinik,2016
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献