Optimization of the duration of the pioneer construction period

Author:

Oleinik Pavel,Kuzmina Tatyana,Zueva Diana,Balmashnova Mariya

Abstract

Abstract The construction of facilities in hard-to-reach and underdeveloped areas is an extremely difficult task, the solution of which largely depends on the quality and timely development of the construction area. Significant reserves for reducing the territories pioneer duration are in the combination of the pioneer construction and preparatory periods. To this end, on the basis of a generalization of practical experience, a methodology for linking work is proposed, based on the found equations of communication between the scope of work, the intensity of consumption of labor and technical resources, and the duration of work. The options for changing the scope of work: from the minimum size of the work area per team to the full work area for the whole process are examined and the conditions for rational combination of the pioneer construction and preparatory periods are disclosed.

Publisher

IOP Publishing

Subject

General Medicine

Reference12 articles.

1. Intensification of the investment process of construction;Oleinik,2016

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3