Aggregate production planning model under demand uncertainty: A case study in an Indonesian cement company

Author:

Gozali I,Pujawan I N,Arvitrida N I

Abstract

Abstract In this paper, a multi-product, multi-stage and multi-period aggregate production-planning model is proposed to deal with demand uncertainty in an Indonesian Cement Company. The demand uncertainty is modelled as a number of discrete scenarios with known probabilities. This problem consists of determining the optimal production, subcontract and inventory level of clinker and cement in order to fulfil demand at minimum cost within the planning horizon. This research aims to develop an aggregate production-planning model under demand uncertainty in an Indonesian Cement Company. The model constructed as a linear programming problem using scenario-based approach to satisfy demand at minimum cost. The outcome of this research is the development of an aggregate production-planning model that accommodates demand uncertainty in Indonesian Cement Company by considering material balance at each stage of the process, equipment capacity and inventory storage capacity during the planning horizon. The proposed model can be used as a decision-making basis for production and inventory control manager to produce or subcontract clinker and semen in each period to fulfil demand at minimum cost.

Publisher

IOP Publishing

Subject

General Medicine

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3