Abstract
Abstract
In the last 40 years several large laboratories, e.g. CERN, DESY, TJNAF, constructed the accelerators with large number of superconducting (sc) cavities or sc magnets operating at 2 or 4 K temperature levels. The sc cavity operation requires more stringent ranges of pressure variation than ones of sc magnets. In comparison to small testing benches or single cavities modules, for large accelerators a complicated controlling of refrigerator and cryogenic system is required. In the present paper, a review of controlling principles and loops, typically applied for the controlling of liquid helium (LHe) level and pressure for large accelerators is presented. Other possible control loops, e.g. cascade control or multivariable feed-back (or with feed-forward option), are discussed. Activities related to the commissioning of control loops and some supporting measurements are mentioned. Experimental data on investigation of gas/liquid thermal equilibrium are also presented.
Reference29 articles.
1. Commissioning and first coold down of XFEL linac;Bozhko;IOP Conf. Ser.: Materials Science and Engineering,2017
2. First operation of the XFEL linac with the 2K cryogenic system;Paetzold;IOP Conf. Ser.: Materials Science and Engineering,2017
3. Process options for nominal 2K Helium refrigeration system design;Knudsen;Advances in Cryogenic Engineering,2012
4. RF heat load compensation with electrical heater for XFEL accelerator - measurements at CMTB, AMTF and FLASH;Ayvazyan;IOP Conf. Ser.: Material Science and Engineering,2015
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献