Author:
Dewi Sarastya,Alhilman Judi,Tatas Dwi Atmaji Fransiskus
Abstract
Abstract
In a manufacturing company, the machine is one of the most important elements in their production process because machine failure can stop the production process. Therefore, the initial step to minimizing losses caused by machine failure can be done by evaluating the machine condition. Evaluation of machine performance is carried out by measuring the effectiveness of the machine with the Overall Equipment Effectiveness (OEE) method. Based on the calculation result, the OEE value of the machine is 68.63% and this value still under the Japanese Institute of Plant Maintenance standard. Six big losses analysis is performed to determine the biggest loss that affects the effectiveness of the machine. The result of six big losses calculation shows that the most influential factor for the low OEE value of the machine is Reduced Speed Loss (39.12%). Causal analysis with a fishbone diagram is done to find out the causes of the highly reduced speed loss. To calculate the equipment cost loss use the Overall Equipment Cost Loss (OECL) methods. The total of the overall equipment cost loss is IDR 849, 839, 947.53.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Proposal for a Digital OEE Architecture with the Integration of Analysis Parameters of Machines of the Manufacturing Industry;Flexible Automation and Intelligent Manufacturing: Establishing Bridges for More Sustainable Manufacturing Systems;2023-08-25