The implementation of non-unit-based scheduling method in a housing project

Author:

Christiawan Kevin Natanael,Gondokusumo Onnyxiforus

Abstract

Abstract Of the various types of construction projects, contractors often encounter repetitive projects. Many methods have been used for scheduling repetitive projects, but most repetitive scheduling methods have the basis that they are composed of many identical production units. Scheduling repetitive projects using unit-based methods has several constraints such as modeling and applying them to construction projects requiring simplification of repetitive activities to have a single duration and in a fixed production sequence. Therefore, a non-unit-based scheduling method is developed. In this analysis, the project data was obtained from a housing project. Based on the data, an analysis was conducted to look for the effect of changes in the factors used in the non- unit-based scheduling method on the final duration of the project. From the analysis it was found that the factors used in the non-unit-based scheduling method such as duration, priority order of activities, number of resource groups, and relationships between activities greatly influenced the final duration of the project.

Publisher

IOP Publishing

Subject

General Medicine

Reference10 articles.

1. Object-oriented model for repetitive construction scheduling;El-Rayes;J. Constr. Eng. Manage.,2001

2. Optimal planning and scheduling for repetitive construction projects;Hyari;J. Constr. Eng. Manage.,2006

3. Non-unit-based planning and scheduling of repetitive construction projects;Huang;J. Constr. Eng. Manage.,2006

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3