Author:
Zelentsov L B,Mayilyan L D,Hakobyan N G,Pirko D V
Abstract
Abstract
The article discusses the problems of making organizational and technological decisions in the investment and construction projects (ICP) management using intelligent construction management systems (“IMS Construction”).
The relevance of the study is due to the fact that in economic instability conditions in the Russian Federation, the construction organizations need to increase the organizational and technological decisions efficiency in order to reduce production costs.
The ISU “Construction” introduction allows the managerial decision-making of two independent areas integration in the implementation of ICP, based on the rules and precedents related to the methods of generating new knowledge, which allows to get a new impetus in the intelligent control systems development.
The greatest interest in using the proposed methodology formalized in the IMS “Construction” development is the possibility of accumulating knowledge about the ICP control system possible behavior, which is more likely to predict the right decision adoption in the event of any situations that have not been previously met or recognized.
Reference16 articles.
1. Autonomous adaptive control method;Zhdanov;News of the Academy of Sciences. Theory and Control Systems,1999
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献