Quality of Organizational Processes Assessing in Modeling a Low-Rise Construction System Development

Author:

Ikonnikova A,Ikinnikov V,Panova A

Abstract

Abstract Main difficulties, arising in the selection of a workers link, as well as changes in the parameters of the model, depending on the composition of the link in organizational and technological planning are discussed in this article. The results, obtained in the course of the study, are summarized in graphs. Variant modeling of the technological process complexes implementation consists in finding a variant of teams’ composition, taking into account their intra-team plans and combining them at the work fronts, where the indicators of production program (construction plan) will be the best one, according to a given criterion and restrictions on resources and conditions of the customer. Otherwise, construction period of the first option was 22.46 months: the duration of each subsequent house construction was 19.5 days longer than the previous one. In variants 2 and 3, this difference decreased to 14.5 days, and the total duration decreased by 4.88 months and amounted to 17.58 months.

Publisher

IOP Publishing

Subject

General Medicine

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3